The Hydraulic Flushing Unit that was used on the KAKG Platform has some unique features:
-
Pump is air driven
-
Hazardous Area Classification is never a concern
-
The pump has 45:1 ratio
-
The system utilizes 3micron filters for achieving AS4069 6F
-
The pump can provide flushing for systems that are closed, as well as open looped
Emergency or Urgent Queries, please call our Hotline 24/7:
+6 019 2065206
Surf - Subsea System

-
SURF - Subsea Umbilicals, Risers and Flowlines
-
Topside Structural Engineering
-
Master Control Station (MCS) & Electrical Power Units (EPU)
-
Hydraulic Power Units (HPU)
-
Subsea Production Control System / Subsea Distribution System
-
Topside Umbilical Terminations (TUTA/TUTU)
-
Subsea Christmas Trees (XT)
-
Subsea Manifold System
-
Installation and Workover Controls (IWOCS)
-
Completion Workover Riser System (CWOR)
-
Subsea Isolation Valve (SSIV) system
-
Subsea Pigging Expertise
-
Offshore Subsea System Pre-commissioning, Commissioning & Start-up
-
Refinery and onshore pipeline Commissioning and Start-up
Trainings

-
Running and Retrieving Tools
-
Installation and Workover Controls
-
Completion/Workover Riser & Workover controls umbilical
-
Satellite Well
-
Template
-
Flowlines
-
Production Controls
-
Production Riser
-
Riser Base / SSIV
-
Manifold
-
Export Flowline
Subsea Pigging

-
Subsea Pig Launcher retrieval,
-
Reload and re-installment procedures
-
Pre-commissioning and
-
Commissioning of subsea
-
Pig launching systems.
For Deepwater applications pig launcher is typically located on the topside with a pigging loop that enables the pig(s) to move through the subsea pipelines into a manifold header, around the pigging loop and into the second manifold header into the pipeline, up the riser and into the pig receiver.